Ocean · Land schemes of Shivanand Land Development Corp.

Industrial park at Kala Talav · Villa residence parcels · Seafront villas
Three schemes under one name: an industrial park on the highway that carries the Dholera corridor into Bhavnagar, residence parcels beside it, and a villa estate on the coast. The park has a website of its own, with the map, the masterplan and the incentive workings.
Ocean Industrial Park · Upcoming
01On the Bhavnagar–Ahmedabad National Highway at Kala Talav: a 60-metre main road, five parks named by survey number, a plot-cutting master plan drawn in August 2026, and a working city fifteen minutes away.
The group’s industrial plot scheme at Kalatalav, near the Nirma plant. Serviced land for owners who want to build to their own specification, backed by the group’s land development discipline.
The pin is 21.8578° N, 72.1176° E. North on the highway is Adhelai, where the Ahmedabad–Dholera Expressway ends; south is Bhavnagar Terminus, the airport and a port being rebuilt around the world’s first CNG terminal. Bhavnagar taluka is notified Category B under the Viksit Gujarat Industrial Policy 2026, which puts an MSME’s incentive basket at up to 35% of eligible investment.
The five parks, by survey number
Key planThe corridor, dated
02Roads first, then the airport and the fab, then rail, then the sea link. The Ocean site carries the full timeline with a status against every item and the sources behind it.
The Ocean family
03Four Ocean Villa residence parcels sit inside the industrial park’s key plan. On the coast, Ocean Bay Villas is the group’s seafront estate.
Ocean Villa · Residence parcels
Survey numbers 202, 272 and 402 along the existing road inside the key plan: homes for the people who run the units, within walking distance of them.
Ocean Bay Villas · Upcoming
A seafront villa estate approached through a monumental sculptural gateway, its masterplan laid out along the shoreline. Serviced plots and villas, backed by the group’s land development discipline.
Go deeper
The interactive map with every distance, the masterplan by parcel, the 2026 incentive calculator, the corridor timeline, and the updates as they happen.